Does anyone know what is happening ? Have you heard any rumours about it, ie when, or if work is ever likely to start on it again
Also there seems to be very little activity on the widening of the Mesogi to Tsada main road

Dominic, I don’t think the works between Tsada and Stroumbi are road widening, the extra metre or so of width on the downhill side Heidi g towards Stroumbi is at a 15/20 degree slope with a large raised edge, and would be borderline dangerous if taken at any sort of speed.Dominic wrote: ↑Sat May 31, 2025 12:41 pm Regarding the motorway, I believe it is out to tender.
Regarding the B7, they are still actively working on it, though at the moment the work is happening on the other side of the hill, between Tsada and Stroumbi. There are traffic lights there daily during the week. Presumably, they aren't doing anything at the Mesogi end at the moment, as that would cause more traffic lights and people would moan about there being too many traffic lights.
My only concern about the road widening is that they appear to be doing so by building over the drainage ditches that run between the road and the hill. I haven't inspected the work closely, but if that is indeed the case it will mean that when we next have a wet winter the road will have issues with flooding. Hopefully I am wrong.