Looking for advice from this knowledgeable site please?
With regard to PV Net Metering on my house (in Peyia), whose responsibility is it to acquire the necessary Building Permit for the installation (is it mine or is it the installation company)? If it is my responsibility, can anyone ‘baby step’ me through the process and where I must go to get it done please?
Thank you in advance Pete
Building Permit
- Expresspete
- Posts: 76
- Joined: Sat Feb 18, 2017 1:19 am
Re: Building Permit
When I had mine installed I gave the company I bought it from power of attorney to apply for permission on my behalf. That was all I had do (except for having my signature certified by the mayor).
Re: Building Permit
its your responsibility but many of the installation companies will help.. always good to ask them.. also ask any neighbour who has had PV installed near you..Expresspete wrote: ↑Fri Mar 10, 2023 3:29 pm Looking for advice from this knowledgeable site please?
With regard to PV Net Metering on my house (in Peyia), whose responsibility is it to acquire the necessary Building Permit for the installation (is it mine or is it the installation company)? If it is my responsibility, can anyone ‘baby step’ me through the process and where I must go to get it done please?
Thank you in advance Pete
- Mighty Sprite
- Posts: 129
- Joined: Fri Dec 30, 2016 11:01 am
- Expresspete
- Posts: 76
- Joined: Sat Feb 18, 2017 1:19 am
Re: Building Permit
Thanks everyone. The (very famous in the area) company I’m using has now completed the installation, including 3 phase, and then called me asking for the Building Permit. There was a long silence on the phone when I replied no because you said you were going to obtain it……That was 10 days ago and they still don’t have it
Living the Sunshine dream 

- Mighty Sprite
- Posts: 129
- Joined: Fri Dec 30, 2016 11:01 am
Re: Building Permit
Are we talking about the same building permit here?
The EAc needs the building permit for the house before they will proceed. I had to go to the planning department to get mine as I only had the title deeds.
Any permit for the EV panels was done by the installer.
The EAc needs the building permit for the house before they will proceed. I had to go to the planning department to get mine as I only had the title deeds.
Any permit for the EV panels was done by the installer.