If you don't have three phase power supply I don't think it is possible to go past 4Kw. I could be wrong though.jeba wrote: ↑Wed Jun 26, 2019 7:21 pmThat's not always possible. I wanted to enlarge my 4kWp system and was told the EAC wouldn't allow it.Anarita John wrote: ↑Wed Jun 26, 2019 3:56 pm If the 5Kw system is insufficient for our needs, we have been told further panels can be installed at a later date.
Well it is possible.
We have a 4Kw system but we have a separate system which just handles the pool pump. It is entirely separate from the mains and isn't affected by EAC at all.