Late last year, I decided to do a rooftop PV project. Unfortunately, it was delayed when the EAC closed down at the start of the coronavirus problem in February, so I could not get their planning permission. Fast forward to June, still nothing done. At that point, a domestic problem occurred, which required some minor structural problems with our housing on a temporary basis. The local authorities had no problem with this but the EAC require a full planning permission before they enter into the matter. By the time that it becomes possible for the permit to be issued, the whole temporary affair will probably have been abandoned anyway.
Result: no PV project